English Español Português Français Pусский

Glazed Tile Roll Forming Machine
Pre-painted Steel Roll Forming Machine
C’ Z’ Purline Forming Machine


Products Category
Contact Us

Name: Allen Chen
Tel: +86-510-83760601
Fax: +86-510-88793825
Mobile: +86-13616182007
E-mail: info@wuxisunway.com
Add: No.35 of Xigang East road,Donggang Town,Wuxi,China
MSN: info@wuxisunway.com
Skype: allenwxmc

I'm Online Chat Now

Guard rail roll forming machine

Guard rail roll forming machine Guard rail roll forming machine Guard rail roll forming machine Guard rail roll forming machine

* Material: Galvanized , HR,CR Coil
* Material Thickness: 3mm
* Main Power:22KW
* Forming Speed: 10-15m/min
* Drive: Chain drive/gear box drive(according customer's require)
Main Parts
* Hydraulic Decoiler
* Feed & leveling unit
* Hydraulic punching unit
* Roll Forming System
* Hydraulic Cutting
* Hydraulic Station
* PLC Control System
* Run-out Table
Capability characteristic and technical parameter
1)Decoiler : passive decoil ,manual tighting maximum weight 5T
2)Levelling unit: diameter of leveling roller: ¢120mm
3)Hydraulic punching: two set punch models
4)Roller material : GCr15, quenching hardness HRC580-600
5) Roll stand: 18 stations.
6)Speed: 10-15m/min(not including punching and cutting)
7)material of main shaft: 45# steel, heat treatment,diameter ¢90mm
8)Main motor power: 22kw
9)Hydraulic motor power:11KW
10)Frequency converter: Panasonic
11)Material of blade:Cr12
12)Length tolerance:10±2mm
13)PLC: Computer adopt Panasonic PLC
Technological  process
Manual decoil ~guide feeding~leveling~punching hole ~guide feeding ~roll forming ~cutting the set length~output

* Payment Term: 30 T/T in advance, 70% T/T before delivery
* Delivery Time: Within 50-65 Days after receipt of the down payment
* Warranty: 1 year and life-long maintainance
*Installation and debugging: We will send professional engineer   to make installation and debugging, Buyer pay our engineer each one 50 USD/day, and provide accommodation, food and the round-trip ticket fee.
* Installation Days: about 5 days

Feedback Form

Related Products :