English Español Português Français Pусский

Glazed Tile Roll Forming Machine
Pre-painted Steel Roll Forming Machine
C’ Z’ Purline Forming Machine

Subscriptions

Products Category
Contact Us

Name: Allen Chen
Tel: +86-510-83760601
Fax: +86-510-88793825
Mobile: +86-13616182007
E-mail: info@wuxisunway.com
Add: No.35 of Xigang East road,Donggang Town,Wuxi,China
MSN: info@wuxisunway.com
Skype: allenwxmc

I'm Online Chat Now

Guard rail roll forming machine

Guard rail roll forming machine Guard rail roll forming machine Guard rail roll forming machine Guard rail roll forming machine
Details:

Summary
* Material: Galvanized , HR,CR Coil
* Material Thickness: 3mm
* Main Power:22KW
* Forming Speed: 10-15m/min
* Drive: Chain drive/gear box drive(according customer's require)
Main Parts
* Hydraulic Decoiler
* Feed & leveling unit
* Hydraulic punching unit
* Roll Forming System
* Hydraulic Cutting
* Hydraulic Station
* PLC Control System
* Run-out Table
Capability characteristic and technical parameter
1)Decoiler : passive decoil ,manual tighting maximum weight 5T
2)Levelling unit: diameter of leveling roller: ¢120mm
3)Hydraulic punching: two set punch models
4)Roller material : GCr15, quenching hardness HRC580-600
5) Roll stand: 18 stations.
6)Speed: 10-15m/min(not including punching and cutting)
7)material of main shaft: 45# steel, heat treatment,diameter ¢90mm
8)Main motor power: 22kw
9)Hydraulic motor power:11KW
10)Frequency converter: Panasonic
11)Material of blade:Cr12
12)Length tolerance:10±2mm
13)PLC: Computer adopt Panasonic PLC
Technological  process
Manual decoil ~guide feeding~leveling~punching hole ~guide feeding ~roll forming ~cutting the set length~output



* Payment Term: 30 T/T in advance, 70% T/T before delivery
* Delivery Time: Within 50-65 Days after receipt of the down payment
* Warranty: 1 year and life-long maintainance
*Installation and debugging: We will send professional engineer   to make installation and debugging, Buyer pay our engineer each one 50 USD/day, and provide accommodation, food and the round-trip ticket fee.
* Installation Days: about 5 days


Feedback Form

Related Products :